Aerial Photographs of Crane Mountain Landfill
Cell Construction Progress 2004 - 2011 Slide Show

Shows the change in cells with approximately 6 month time lapse between photos.
November 3, 2011 Photos Slide Show

Shows all photos in the November 2011 series.
May 6, 2011 Photos Slide Show

Shows all photos in the May 2011 series.
The photos below are a selection of aerial shots taken during the current and previous years.

Landfill Site looking ENE shows proximity to communities and fresh water ponds along the Saint John River

Composting and Recycling 3 Views

Construction and Demolition Nov 2011 looking E

Nov 2011 Cells 1-4 capped, Cell 5 active, Cell 6 under construction looking E

May 2011 Cells 1-3 capped, Cell 4 being capped, Cell 5 active looking SE

Nov 2010 Cells 1-3 capped, Cell 4 almost capped, Cell 5 active looking E

May 2010 Cells 1-3 capped, Cell 4 being capped, Cell 5 active looking E
Nov 2009 Cells 1-3 capped, Cell 4 being capped Cell 5 active looking SE
Nov 2009 Close up of Cell 4 being capped.
Oct 2008 Cells 1-3 capped, Cell 4 active, Cell 5 under construction looking E
Nov 2007 Cells 1-3 capped, Cell 4 active, Cell 5 under construction looking E

NE Corner of site showing Carpenter Center, hazardous waste dropoff area

Site runoff settling ponds, (notice colour change from large to smaller finishing pond).

Leachate Surge Pond

Maintenance building, landfill gas flaring stack and new power generator fueled by landfill gas

Power generator and flaring stack
 
General views of site looking W, NW and N , showing nearby lakes beyond the site.
General view looking S along highway 7 with nearby lakes visible
General view looking N shows area for future cell expansion in the foreground.
|