Box 3263, Grand Bay-Westfield, NB, Canada E5K 4V5
2004 - 2009 Power Point Show (Click to
advance slides)
Shows the change in cells with approximately 6 month time lapse between photos
Oct 2008 Screen Resolution High Resolution
Landfill Site looking NE shows proximity to communities
along the Saint John River
Nov
2009
Screen Resolution
High Resolution
Composting and Recycling looking NW
Nov
2009
Screen Resolution
High Resolution
Construction and Demolition looking E
Nov
2009
Screen Resolution
High Resolution
Cells 1-3 capped, Cell 4 being capped Cell 5 active looking SE
Nov
2009
Screen Resolution
High Resolution
Close up of Cell 4 being capped.
Oct 2008
Screen Resolution High Resolution
Cells 1-3 capped, Cell 4 active, Cell 5 under construction looking E
Nov 2007 Screen Resolution High Resolution
Cells 1-3 capped, Cell 4 active, Cell 5 under construction looking E
Nov
2009 Screen Resolution High Resolution
NE Corner of site showing Carpenter Center,
hazardous waste dropoff area
and construction site runoff settling
ponds
Nov
2009 Screen Resolution
High
Resolution
Construction site runoff settling ponds, (notice colour change from large to small pond). The pond in the upper left corner of the photo is the leachate surge pond.
Nov
2009 Screen Resolution
High
Resolution
Active area of site looking NW,showing nearby lakes beyond the site.
Nov 2009 Screen Resolution High Resolution
Active area of site looking W, showing nearby lakes beyond the site.
Nov
2009 Screen Resolution High Resolution
General view looking N shows area for future cell expansion in the foreground.
Nov 2009 Screen Resolution High Resolution
General view looking NE shows communities and Saint John River shoreline
Nov 2009 Screen Resolution High Resolution
General view looking S along highway 7 with nearby lakes visable